Difference: ProjectStatusGG (10 vs. 11)

Revision 112011-05-15 - GrantGipson

Line: 1 to 1
 
META TOPICPARENT name="GrantGipsonCAP"

Grant's ProjectStatus

Current Overall Status Statement

Changed:
<
<
Majority of Project Design document has been drafted. I will continue to update it as I work on the project. I have set up my server to be accessed remotely and installed mySQL Server. Now that the basic system has been set up I can begin protoyping components.
>
>
The project has been completed. The majority of the system does not come close to the original specification of features because many of these were deemed too ambitious for the current time frame. However, the basic functionality of the system has been established and tested. Users have the ability to download web pages and combine them into an archive which they can then download. Now that the initial version of the system is ready, additional features and design changes can be made to improve on the original release.
 

Weekly Goals

Line: 14 to 14
 
03-06-2011 1. Write initial prototype of Master Program
2. Write Perl CGI scripts to interact between Apache and Master Program
3. Create initial prototype of Client Plug-in
4. Connect Client Plug-in with Master Program
5. Download single web pages
6. Devise means of backing up system
1. Done
2. Pending
3. Pending
4. Pending
5. Pending
6. Done
03-13-2011 1. Write Perl CGI scripts to interact between Apache and Master Program
2. Create initial prototype of Client Plug-in
3. Connect Client Plug-in with Master Program
4. Download single web pages
1. Pending
2. Pending
3. Pending
4. Pending
04-03-2011 1. Write Perl CGI scripts to interact between Apache and Master Program
2. Create initial prototype of Client Plug-in
3. Connect Client Plug-in with Master Program
4. Download single web pages
1. Done
2. Mostly completed
3. Mostly completed
4. Pending
Changed:
<
<
04-10-2011 1. Setup mySQL
2. Connect Master Program to DB
3. Create Downloader component
4. Download single web pages
1. Done
2. Done
3. In process
4. Pending
>
>
04-10-2011 1. Setup mySQL
2. Connect Master Program to DB
3. Create Downloader component
4. Download single web pages
1. Done
2. Done
3. Done
4. Done
05-08-2011 1. Finish initial system
2. Create web interface
3. Finish client plug-in
4. Test system
5. Write user documentation
1. Done
2. Done
3. Done
4. Done
5. Done
 

Risk Management

Line: 51 to 52
  Specific Activities Planned of activities to address top risks
<-- /editTable -->
Changed:
<
<
Physical server may prove unreliable Backup system 03-14-2011 2 100% 03-14-2011 03-14-2011 Finished
David keeps asking me to play Settlers Varies 01-05-2011 0% 05-21-2011   LOSING MY MIND
>
>
Physical server may prove unreliable System was moved to personal laptop     100%     Finished
David keeps asking me to play Settlers Varies 01-05-2011 0% 05-21-2011   LOSING MY MIND
 
Unfamiliar with Python Reading documentation, assess situation     0%     Abandoned
Changed:
<
<
Vague security requirements Research and define     0%     Pending
>
>
Vague security requirements Beyond current scope of project     0%     Abandoned
  -- JimSkon - 2011-02-10 \ No newline at end of file
 