CSC4062 Computer Application Practicum

Trevor Boardman Project Page - Live Wellness Center Counseling Logging System

Contact Info

Phone: 614-716-8871

Email: boardmantm@mail.mvnu.edu

Contact me for:

Any questions that you may have about the product

Implementation Permission/Assistance

Webpage Demo/Temporary Login Credentials

For Source Code and System Build Instructions, Please Contact Myself or Joseph Kadrich

Project Documentation

  1. Project Proposal
  2. System Requirements Specification with prioritized requirements
  3. Research results on possible solutions
  4. Architectural design proposal
  5. Design proposal
  6. Design Complete
  7. Equipment and materials specification
  8. System documentation
  9. System test specification
  10. Systems test results
  11. System presentation and demonstration
Spring Status Report

LWC Logger Webpage

Work Log

  • 2-3 hours a week in the fall
  • 4-5 hours a week in the spring

Date Start Time End Time Time Description
2015-09-7 4:00PM 5:00PM 1:00 Initial meeting
2015-09-9 6:00PM 7:00PM 1:00 Project Research
2015-09-14 4:00PM 5:00PM 1:00 Second Meeting
2015-09-17 10:00AM 11:00AM 1:00 Project Research
2015-09-21 1:00PM 2:00PM 2.00 Meeting with Doug
2015-09-21 3:00PM 5:00PM 2.00 Project Research and Meeting
2015-09-24 10:20AM 11:20AM 1.00 Weekly Team Meeting
2015-09-28 1:00PM 2:00PM 1.00 Meeting with Doug
2015-10-01 10:20AM 11:20AM 1.00 Weekly Team Meeting
2015-10-05 1:00PM 2:00PM 1.00 Meeting with Doug
2015-10-08 10:20AM 11:20AM 1.00 Weekly Team Meeting
2015-10-12 1:00PM 2:00pm 1.00 Meeting with Doug
2015-10-15 10:20AM 11:20AM 1.00 Weekly Team Meeting
2015-10-22 10:20AM 11:20AM 1.00 Weekly Team Meeting
2015-10-26 1:00PM 2:00PM 1.00 Meeting
2015-10-29 10:20AM 11:20AM 1.00 Research
2015-11-02 1:00PM 2:00PM 1.00 Meeting
2015-11-05 10:20AM 11:20AM 1.00 Research
2015-11-09 1:00PM 2:00PM 1.00 Meeting
2015-11-12 10:20AM 11:20AM 1.00 Research
2015-11-16 1:00PM 2:00PM 1.00 Meeting
2015-11-19 10:20AM 11:20AM 1.00 Research
2015-11-26 10:20AM 11:20AM 1.00 Research
2015-11-27 2:10PM 3:10PM 1.00 Research
2015-12-01 10:20AM 11:20AM 1.00 Research
2015-12-03 10:20AM 11:20AM 1.00 Research
2016-02-02 2:30PM 3:30PM 1.00 Meeting with Doug
2016-02-11 11:00PM 3:00AM 4.00 Research/Testing
2016-02-18 11:00PM 4:00AM 5.00 Research/Oauth Testing and Attempts
2016-02-16 2:30PM 3:30PM 1.00 Meeting with Doug
2016-02-18 11:00AM 11:30AM .50 Meeting with Joe/Research
2016-02-18 11:00PM 12:00AM 1.00 Meeting with Joe/Requirements
2016-02-19 12:00AM 4:00AM 5.00 Research/Documentation/Design
2016-02-19 11:00AM 12:00PM 1.00 Document editing
2016-02-23 2:30PM 3:30PM 1.00 Meeting with Doug and Skon
2016-02-29 10:00PM 3:00AM 5.00 Server/Database/php connector setup/Research
2016-03-01 11:00AM 12:00AM 13.00 Java program to connect to database/WGET/CURL/Java Listener/mysql settings/research
2016-03-03 10:00PM 12:00AM 2.00 Coding research
2016-03-10 10:30AM 5:30PM 7.00 Java listener program/script
2016-03-10 10:30AM 2:00PM 3.50 Scripting
2016-03-10 11:30PM 3:30AM 4.00 Coding
2016-03-13 10:00PM 12:00AM 2.00 Coding
2016-03-14 10:30PM 5:00AM 6.50 Coding
2016-03-15 2:30PM 3:30PM 1.00 Meeting with Doug
2016-03-17 9:00AM 11:00AM 2.00 Project Work
2016-03-22 2:30PM 3:30PM 1.00 Meeting with Doug
2016-03-24 9:00AM 11:00AM 2.00 Project Work
2016-03-29 9:00PM 11:00PM 2.00 Project Work/Website Planning
2016-03-31 9:00PM 11:00PM 2.00 Project Work
2016-04-05 9:00PM 11:00PM 2.00 Research of SSH
2016-04-07 2:00PM 3:00PM 1.00 Meeting with Joe/Status Report
2016-04-12 10:00PM 12:00AM 2.00 Meeting with Joe/Project Work/Script/Test Cases
2016-04-14 10:00PM 12:00AM 2.00 Test Cases/Script Work
2016-04-20 8:00PM 12:00AM 4.00 Script Work/Drupal Work
2016-04-21 10:30AM 4:30PM 6.00 Script Work/Drupal-Php Work
2016-04-21 8:30PM 12:30AM 4.00 Script/Drupal Work
2016-04-22 10:30AM 12:00PM 1.50 Script/Drupal Work/Meeting with Joe
2016-04-22 10:00PM 1:00AM 3.00 Script/Drupal Work/Meeting with Joe
2016-04-23 10:00PM 1:00AM 3.00 Script/Drupal Work/Meeting with Joe
2016-04-24 11:00PM 3:00AM 4.00 Script/Drupal Work/Meeting with Joe
2016-04-25 12:00PM 2:00PM 2.00 Script/Drupal Work/Meeting with Joe
2016-04-25 9:00PM 2:00AM 5.00 Script/Drupal Work/Meeting with Joe
2016-04-26 7:00PM 3:00AM 8.00 Script/Drupal Work/Meeting with Joe/Documents
2016-04-27 8:00PM 9:00AM 11.00 Script/Drupal Work/Meeting with Joe/Documents/Powerpoint/State-City Dropdown
2016-04-28 3:00PM 12:00AM 7.00 Script/Drupal Work/Meeting with Joe/Documents/Raspberry pi setup
2016-04-28 11:00AM 1:45PM 2.75 System Setup/Testing/Presentation
2016-04-28 8:00PM 9:30PM 1.50 System Documentation/Project Finalization
Total Time Spent on Project     170.25  
Topic revision: r26 - 2016-04-29 - TrevorMBoardman
 
This site is powered by the TWiki collaboration platformCopyright &© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback