Lashley, Jacob Work Log

Date Hours Description of work completed
04-07-2010 1 In Class doing Rapid Prototyping.
04-05-2010 1 Reading for Quiz.
04-08-2010 1 Worked on Second life preso-matic tool.
04-09-2010 2.45 Class work, second life kits, powerpoint & photoshop development to kits. Got more linden to upload slides. Still need to contact about linden for second tool. ( On a side note would it be safe to be under 8 hours since we did not have class monday therefore the total number required for the total classes would have been lowered ? )
04-11-2010 2 Work with second life environment and first tool.
04-12-2010 4 Class meeting, work on therac-25, second life tool and write up. Getting ready for pres. tomorrow.
04-14-2010 1 class
04-16-2010 2 class , sloddle work
04-15-2010 2 group meeting, reading
04-17-2010 1 class
04-19-2010 2 class, group meeting, second life review
04-20-2010 3 class, second life study
04-21-2010 2 class , groups
04-23-2010 2 class , reading
04-25-2010 4 second life tools
04-26-2010 3 Class, Looking up info for objectives.
04-27-2010 3 Class, Setting up info. for wiki
04-28-2010 2 Class, Group Meeting
05-29-2009 2 class, class work reading
05-03-2010 3 class, class reading, group meeting
05-04-2010 4 class, group work, class work
05-05-2010 2 class, class meeting
05-07-2010 1 class
05-17-2010 3 class, class reading and work
05-18-2010 3 Class pres. group disscussion
05-19-2010 2 group meeting and working on final, class
05-20-2010 4 group meeting, working on group final
05-21-2010 1 class
Topic revision: r10 - 2010-05-14 - JacobLashley
 
This site is powered by the TWiki collaboration platformCopyright &© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback