Currently, the project and all associated documentation is complete and posted on the Wiki. All testing has been completed, bugs have been minimized and the software is ready for use.

Since the initial software design, some feautures have been left out. It became clear during development that the scope of the project was much larger than available time to complete. These excluded features are:

1. The ability to export schedules to Excel.

2. The ability to access this tool through a website.

-- MainMattForaker - 2010-05-20

Topic revision: r2 - 2015-04-17 - JimSkon
 
This site is powered by the TWiki collaboration platformCopyright &© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.